Abstract

This study presents the research and previous tests to incorporate in the shotcrete design a percentage of tailings material that replaces another percentage of sand for support purposes in underground mining, maintaining adequate safety factors in our Mining Operation. 

To develop the technical research, several designs have been conducted at laboratory level, as well as field tests and monitoring of the shotcrete with 10% tailings in the design. Strength tests have been conducted at 4 hours, 3 days, 7 days, 14 days and 28 days, and in the case of flexural strength, at 28 days. And we have complemented the research with microscopy tests of both the tailings and the river sand.



Artículos relacionados

En esta edición: Darío Zegarra, ProEXPLO 2025 y gestión del agua en minería

Seguir leyendo
X

Ingrese sus datos aquí

X

Recuperar Contraseña

X

Recuperar Contraseña

Si tiene problemas para recuperar su contraseña contáctese con el Área de Servicio al Asociado al teléfono 313-4160 anexo 218 o al correo asociados@iimp.org.pe

X

Ha ocurrido un error al iniciar sesión

Si tiene problemas para recuperar su contraseña contáctese con el Área de Servicio al Asociado al teléfono 313-4160 anexo 218 o al correo asociados@iimp.org.pe

X

Ingrese sus datos y nos pondremos en
contacto para poder completar su compra

X

Ingrese sus datos y nos pondremos en
contacto para poder completar su compra