MINERÍA la mejor puerta de acceso al sector minero EDICIÓN 573 / JUNIO 2025 28 Call, R.D. 1982). Monitoring Pit Slope Behavior, Stability in Surface Mining, Volume 3, Society of Mining Engineers, Chap. 9. Call, R.D. Cicchini, P.F., Ryan, T.M. and Barkley, R.C. 2001. Managing and Analyzing Overall Pit Slopes, Proceedings, Slope Stability in Surface Mining, (Hustrelid, McCarthur and van Zyl eds.) SME, pp. 39 – 46. Canmet. 1977. Canada Centre for Mineral and Energy Technology. Pit Slope Manual. Publ. 77-15, Chapter 8, pp. 188. Dick GJ. 2013. Development of an early warning time- of-failure analysis methodology for open pit mine slopes utilizing the spatial distribution of ground- based radar monitoring data. M.A.Sc thesis, The University of British Columbia, Vancouver, BC. Federico A, Popescu M, Elia G, Fidelibus C, Interno G, Murianni A. 2012. Prediction of time to slope failure: a general framework. Environmental Earth Science 66(1):245–256. Feltus, W. R. 1993. An empirical concept for open pit slope monitoring, in Proceedings of the Australian conference on geotechnical instrumentation and monitoring in open pit and underground mining, Kalgoorlie, Western Australia, 21-23 June 1993 / ed. by Szwedzicki T. - Rotterdam: Balkema, 1993, pp. 149–154. Flores, G. and Karzulovic, A. 2001. The Role of the Geotechnical Group in an Open Pit: Chuquicamata Mine, Chile, Proceedings, Slope Stability in Surface Mining, (Hustrelid, McCarthur and van Zyl eds.) SME, pp. 141– 152. Fukuzono, T. 1985. A new method for predicting the failure time of slopes. Proceedings, 4th International Conference & Field Workshop on Landslides, Tokyo, pp. 145–150. Kennedy BA. 1972. Methods of monitoring open pit slopes. In: Proceedings of 13th symposium on rock mechanics, Urbana, pp. 537–572. Kennedy BA, Niermeyer KE. 1970. Slope monitoring system used in the prediction of a major slope failure at the Chuquicamata Mine, Chile. In: Proceedings of symposium on planning open pit mines, Johannesburg, pp. 215–225. Kennedy BA, Niermeyer KE, Fahm BA. 1969. A major slope failure at the Chuquicamata Mine, Chile. Min Eng AIME 12(12):60. Hoek E, Bray J. 1977. Rock slope engineering. The Institution of Mining and Metallurgy, London. Martin, D.C. 1993. Time Dependant Deformation of Rock Slope'. PhD Thesis, Univeristy of London. Mercer, K.G. 2007. Time dependent deformational behaviour of usnupported rock slopes, Australian Centre for Geomechanics Newsletter, December 2007, pp. 9–11. Mercer, K.G. 2006. Investigation into the time dependenet deformation behaviour and failure mechanisms of unsupported rock slopes based on the interpretation of observed deformation behaviour, PhD Thesis, University of the Witwatersrand. Sullivan, T.D. 1993. Understanding pit slope movements, in Geotechnical Instrumentation and Monitoring in Open Pit and Underground Mining, T.Szwedzicki (ed.), Balkema, pp. 435-445. Piteau, D.R. 1970. Geological Factors Significant to the Stability of Slopes Cut in Rock. Symposium on the Theoretical Background to the Planning of Open Pit Mines with Special Reference to Slope Stability. A.A. Balkema, pp. 55-71. Newcomen W, Dick G. 2015. An update to strain- based pit wall failure prediction method and a justification for slope monitoring. Proceedings, Slope Stability 2015, Cape Town, pp 139–150. Terzaghi K. 1950. Mechanism of landslides. In: Application of geology to engineering practice (Berkey volume). Geological Society of America, New York, pp 83–123. Zavodni, Z.M. 2000. Time-dependent movements of open pit slopes, in Slope stability in surface mines, Hustrulid and others (eds), SME, pp. 81-87. Zavodni, Z. M. Broadbent CD. 1980. Slope failure kinematics. Bulletin, Canadian Institute of Mining 73(816):69–74. Figura 19. Imagen post colapso (01-12-2022). Figura 20. Imagen post limpieza (01-12-2022).
RkJQdWJsaXNoZXIy MTM0Mzk2